This project is for repair and construction on retention pond, piping restoration, site erosion control and inlet replacement. The project consists of furnishing all labor, materials, and equipment required for the repair, cleaning and replacement of failed retention pond components to meet existing retention pond permit requirements. The SOW requires the cleaning of approximate 500 feet of reinforced concrete pipe (RCP), grading of eroded and damage slopes, installation of rip rap slope protection, repair of 30” RCP joint failure, installing of sod with 4” topsoil. The construction of a reinforced concrete intake structure connection to the 36″ outfall line.