The contractor shall replace and upgrade the existing 2-ton HVAC system serving Room 122B. Electrical Connections for the new HVAC system will be sized through the DOR matched to new equipment. The contractor shall test, balance, and commission the new system as well as the adjacent system to verify proper operation within Room 122B.