The scope of work includes installation of an Automatic Transfer Switch and Main Disconnect for building 90758. The work to be performed includes, but is not necessarily limited to, the following principal features:
1.Provide electrical work required to remove all electrical components in the existing manual transfer switch and install a new automatic transfer switch and new main disconnect switch at Building 90758.
2.New automatic transfer switches shall comply with UFC requirements. Automatic transfer switches shall be 4-pole transfer switches and shall include a maintenance bypass/isolation feature. New automatic transfers switches will be Contractor furnished and Contractor installed.