The work includes installation of new control wiring to the north and south end strobe lighting and incidental related work. Contractor shall tag all primary/secondary and lighting circuits on airfield starting from the
airfield vault and throughout entire airfield at each manhole during construction.

The Contractor shall include the removal of a minimum of 18,000 linear feet if existing control cable in their proposal.