The scope of work includes enclose four (4) metal structure door opening to accommodate new roll-up 15′ x 16′ doors, replacement of fourteen (14) existing roll-up doors (vary in size) with weather tight seals, repair metal structure roofing and siding. Construction is to be accomplished at FC127-128-130-131-132 FC40 S1752-1753 M303.